A coating cannot correct a deck that has tilted toward the water, and most of the decks around the older pools in Torrance have. The pools behind the tracts went in within twenty years of the houses, and their decks were poured at 3 inches or so over the backfill around the shell, which settled for a decade after the pool was dug. The slab followed it down at the pool side, so the fall that once carried rain to the lawn now carries it, and everything on the deck, into the pool.
The answer sold since has been a topping. A cement coat troweled on to hide the cracks, then a second when the first peeled, then an acrylic over that, and each lasts a shorter time than the one before because none of them changes the slope or the base. Kenji Okamoto, who spent 19 years on South Bay crews before founding Hawthorne Torrance Concrete in 2017, reads the level before he reads the surface, because a deck that drains into the pool is not one a topping can save.
So the slab comes out whole, to the bond beam, and goes back at 4 inches on compacted base with a sealed joint at the coping and a bonding wire under it, built to the California Residential Code under a CSLB C-8 license and liability insurance on every job. A fence or gate moved for the breaker has to meet the pool barrier rules again, and we check that with the City first. The deck carries a written workmanship guarantee against defects in how it was built.