From the office on Hawthorne Boulevard the crew goes west on Torrance Boulevard and north on Pacific Coast Highway, and is in Hermosa Beach in about 15 minutes. Plans are lodged with the City of Hermosa Beach Community Development Department at City Hall on Valley Drive, a building permit for a foundation or a wall and an encroachment permit at the apron and the walk. West of the highway the city is in the coastal zone, and a job there beyond flatwork can need a coastal permit too.
The Sand Section, between Hermosa Avenue and the Greenbelt, is where the lots are narrowest, many of them 30 feet wide and served from an alley at the back. A mixer will not fit down most of those alleys, so concrete is pumped from the nearest cross street or barrowed in, and the estimate says which. On the walk streets there is no vehicle access at all, and every yard of concrete arrives on foot, which is planned as a line of its own before a form is set.
The Greenbelt is the old Santa Fe railroad right of way, kept as a strip of park from one end of town to the other, so the Hill Section east of it climbs from Valley Drive to Pacific Coast Highway on sand that was dune before it was street. Lots there step, and the work is retaining walls and stepped footings as much as flatwork. East of the highway the lots widen, the houses are 1950s ranch on flat ground, and a driveway there is the one place a truck can chute straight in.