Hawthorne Boulevard leaves our office in Torrance, climbs through Rolling Hills Estates and ends at Palos Verdes Drive South in Rancho Palos Verdes, and City Hall is on it near the top, so the crew, the permit counter and the job are on one road. Permits come from the Building and Safety Division of the city's Community Development Department, and a lot inside the Landslide Moratorium Area needs an exception from the city before a permit is considered, which we say on the visit.
The city is tracts on graded pads. Eastview, off Western Avenue on the San Pedro side, is the oldest housing, one-story houses from the 1950s, and its drives and garage slabs are the ones most often torn out. The streets off Hawthorne Boulevard and Crenshaw Boulevard, and Miraleste on the east slope, went up in the 1960s and 1970s with two-car drives that climb from the street to the pad, and a drive that climbs on clay is poured at 6 inches in short panels with a heavy broom.
The south side of the city, from Abalone Cove to Portuguese Bend along Palos Verdes Drive South, is the moving ground, and the road itself is repaved as the hill carries it. We look at work there, but we say plainly what a slab can and cannot do on land that is walking toward the sea, and the guarantee excludes ground movement beyond what the joints control. The marine layer sits on the peninsula until late morning through June, so pours set slowly and are finished late.