Our office is on Hawthorne Boulevard in Torrance, and Manhattan Beach is 5 miles northwest up Sepulveda Boulevard with no freeway to sit on, so a crew is at Manhattan Beach Boulevard in about 20 minutes. Permits come from the Building and Safety Division of the city's Community Development Department at City Hall on Highland Avenue, and work on the apron, the parkway or the public walk takes an encroachment permit from Public Works. We file both and meet the inspector at the base.
The Sand Section is the hard one. Its walk streets have no road at the front door, so a mixer parks in the alley or on the nearest through street and the concrete is pumped up the walk, which is why a Sand Section patio is booked for the morning before the alley fills. The Hill Section above it has drives that fall to the street and garages under the house, so a drive there is broomed heavily across the fall. The Tree Section, between Ardmore and Sepulveda, is the flattest ground.
East of Sepulveda the city changes. Liberty Village and the streets around Polliwog Park went up in the 1950s as one-story tracts on lots wide enough for a two-car drive, and these are the drives now being replaced, poured thin sixty years ago on sand that was never compacted. Manhattan Village came later, with drives still sound. Everywhere in the city the marine layer sits on a pour until late morning from May to July, which slows the set and gives the finisher time.